We had Monday and Tuesday as vacation days so Matt and I used our long weekend to Get Shit Done.
Day 1
- Replaced micro-bath light
- Replaced micro-bath light switch
- Replaced mudroom light
- Replace mudroom light switches
- Replaced burnt out GU10 bulb in the kitchen (annoyingly difficult)
- Took down Halloween decorations
- Scraped off loose paint in bathroom closet
- Patched holes in bathroom closet
- Broke my upholstery hammer 🙁
Day 2
- Primed (most of) the bathroom
- Replace dining room light switches
- Replaced entry light switch
Day 3
- Trip to DMV
- Trip to hardware store
- Finished priming bathroom
Day 4
- Eye Exam
- Craft store run
- Replaced bathroom ceiling light and added fan*
- Replaced treads on basement stairs**
- Insulated porch windows
- Got splitting headache and took a nap
In other news, I also created a dedicated Flat-Pack & Vintage Facebook site instead of piggy-backing off my jewelry site. If you want little mini updates and rambling or sneak-peak photos that aren’t quite classy enough for Instagram, that’s your place.
* Hired out. It’s also very annoying to find someone to install a bathroom fan when one does not already exist.
**Also hired out. Matt had dreams of completely ripping down the stairs and rebuilding them himself. I squashed that idea because I’m a jerk and it turned out we only really needed to redo the treads..