Kitchen Remodel Week 3

This week was mostly putzy finishing work on the walls–Monday, Tuesday, and Wednesday were devoted to mudding and sanding the drywall joints. It takes an annoyingly long time since you have to wait for each layer of mud to dry before moving on.

On Tuesday the mudroom tile got installed!

…and then on Wednesday it got strategically pried up.  Turns out the mosaic squares aren’t perfectly square. That combined with our non-level, not-square floor meant some of the spacing would be wonky and really obvious once black grout was added. This meant the tile guy and our project manager spent a chunk of the day popping out certain tiles and then re-laying them to even out the spacing. While not a fun time, this was apparently the easiest option (and I greatly appreciate their attention to detail).

See all those whiter/hazier spots where the mastic has oozed up and is showing? Yeah…those are all the spots they had to fix tile by tile. (The weird dark line across the middle of the floor is just a shadow)

Wednesday also brought a little inspection drama.  We’ve been going back and forth about how to get the sink properly vented and the last plumber who looked at it thought he had a solution that wouldn’t involve ripping out the walls and ceiling. Then he talked to the inspector about it and the inspector wasn’t on board. So then our project manager brought the inspector over to show him what we’re working with…which is a hot mess. Now they have to figure out a way to vent the sink that will make everyone happy.

On Thursday the mudroom tile got grouted! I am ridiculously excited about this fairly simple floor.  So excited I apparently missed getting a picture in time for this post…whoops! We also continued the plumbing drama and hauled the plumber back in to brainstorm. He says he hasn’t been stumped yet… which is all fine and dandy, but there’s a big difference between “this can’t be done” and “this will cost several thousand more than you expected to get done.”

Despite the plumbing complications, the cabinets were (mostly) installed on Friday! They didn’t permanently secure some of the base cabinets or hang the cabinet above the sink since parts of that may need to be demoed (again).

Basically this week was one giant effing headache for a lot of people.

But hey, CABINETS!

 